2006 Reclamation Scheme

   

077-To allow the new Bellway houses to be built in Warsop Vale it was necessary in phase 2, to remove the construction material of the old colliery car park and the weighbridge which had been covered over with waste material from the tip when the colliery closed. This picture shows the beginning of this work in March 2006.
« | < | 61 | 62 | 63 | 64 | 65 | 66 | 67 | 68 | 69 | 70 | 71 | 72 | 73 | 74 | 75 | 76 | 77 | 78 | 79 | 80 | > | »
Total images: 106 | Last update: 26/02/09 14:02 | Generated by JAlbum 7.2 & Chameleon | Help